Tegral – Manufacturing Facility Upgrade Cloncad was appointed for the upgrade works at Tegral’s Athy Manufacturing facility.
The scheme consisted of raising the roof of the existing building and modifying the electrical services to suit. The complete project was delivered while the facility remained 100% operational with zero down time to the day to day operations of Tegral. Our scope of work included Modifying existing Switchgear, Installing new Switchgear, Lighting, General Services, Power, Control and Fire Alarm.
Temporary Services were installed over the existing lines to ensure operatives were still able to carry out their day to day tasks whilst the works were being carried out.
Cloncad was appointed for the upgrade works at Tegral’s Athy Manufacturing facility.
The scheme consisted of raising the roof of the existing building and modifying the electrical services to suit. The complete project was delivered while the facility remained 100% operational with zero down time to the day to day operations of Tegral. Our scope of work included Modifying existing Switchgear, Installing new Switchgear, Lighting, General Services, Power, Control and Fire Alarm.
Temporary Services were installed over the existing lines to ensure operatives were still able to carry out their day to day tasks whilst the works were being carried out.